Sec. 25.1438 - Pressurization and pneumatic
systems.
(a) Pressurization system elements must
be burst pressure tested to 2.0 times, and proof pressure tested to 1.5
times, the maximum normal operating pressure.
(b) Pneumatic system elements must be
burst pressure tested to 3.0 times, and proof pressure tested to 1.5
times, the maximum normal operating pressure.
(c) An analysis, or a combination of
analysis and test, may be substituted for any test required by paragraph
(a) or (b) of this section if the Administrator finds it equivalent to the
required test.
[Amdt. 25-41, 42 FR 36971, July 18, 1977]