KANDAHAR
Effective 08 June 2006 to 05 July 2006
General Info |
Country |
Afghanistan |
ICAO ID |
OAKN
|
Time |
UTC+4:30 |
Latitude |
31.505756
31° 30' 20.72" N |
Longitude |
65.847822
065° 50' 52.16" E |
Elevation |
3337
feet
1017 meters |
Type |
Joint
(Civil and Military) |
Magnetic Variation |
002° E
(01/06) |
Operating Agency |
MILITARY - CIVIL JOINT USE AIRPORT |
Communications |
TWR |
125.5
360.2 |
GND |
126.7
331.2 |
GCA |
122.6
280.825 |
APP |
120.8
122.6
123.7
280.825
385.725 |
METRO |
253.2
|
Runways |
ID
(Click for details.) |
Dimensions |
Surface |
PCN |
ILS
|
05/23
|
10532 x
148 feet
3210 x 45 meters |
ASPHALT |
059FAWT |
NO
|
Navaids |
Type |
ID |
Name |
Channel |
Freq |
Distance From Field |
Bearing
From Navaid |
TACAN |
KAF |
KANDAHAR |
075X |
- |
At
Field |
-
|
NDB |
OKN |
KANDAHAR |
- |
1720 |
At
Field |
-
|
Supplies/Equipment
|
Fuel |
JP-8,
SemiKeroscene MIL Spec T-83133, without icing inhibitor |
Remarks |
CAUTION |
No Rot
Bcn. Ngt ops are at pilots discretion UFN. Emerg lgt sys avbl only on
lowsetting. Thld marker lgt split red/green. No apch lgt. Fst 4500' of
Rwy 23 hasnumerous patches and uneven sfc UFN. Antenna 150m left side
of apch end Rwy 23hgt 45'. Numerous frng rng and ctl explosions in
vcnty of afld. ATC will advise rng status and lctn. Kandahar has no
ramp svcg capabilities. All inbd flt to KAFneed to ensure that all rqr
svcg capabilities are taken care of at the last staion with rmap svc
prior to arr at Kandahar. All C-17 acft must ctc the 451st AEG/CP at
DSN 318-841-1428 for any fuel req, prior to dep prev stn. Kandahar
Afld is PPR for all civ and coalition flt. To req a PPR No, acces
RAMCC website HTTP://RAMCC.DTIC.MIL. and open the AF PPR form. Aircrew
must submit req 48 hrs prior to ETA and no further than 10 days before
ETA. Ctc Afld Mgmt 318-841-1323 or CMDPOST 318-841-1428. |
FUEL |
J8,
MOGAS, DIESEL |
MISC |
OPS ctl
by US mil. All aircrews make ctc 30 NM out to Kandahar GCA. ATIS Not
Avbl. ALL FREQ (UNSECURE) |
RSTD |
24 Hr.
PPR for all mil, civ and coalition flt. Req PPR via RAMCC Website
(http//:RAMCC.DTIC.MIL). To prevent processing delays, the Kandahar
form must be filledout in its entirety. PPR will not be processed
earlier than 5 days in advance.Ctc Afld Management at DSN 318-841-1323
or e-mail your PPR req form to (Kandahar-PPR at (KAF.AFGN.ARMY.MIL).
Rapidly chg rwy conditions due to damage. All inb acft are highly
encouraged to obtain an enroute update of rwy status.
|
|
|